HLI EcoHub Nam Ha continues to uphold its reputation for timely delivery and construction quality. As of June 25, 2025, numerous key project components have reached completion, ready to move into the handover and operational phase, adhering to LEED standards for energy-efficient green factories.
1. Factory Area: Infrastructure and Technical Systems Nearing Completion
For the main factory buildings, a core component of the project, significant progress has been made with key items being finalized:

1.1 Roofing: Installation of roof vents and sub-base construction are complete, ensuring durability and efficient ventilation throughout the factory.

Perimeter Walls and Mezzanine Offices: These sections are currently in their final stages of completion.


1.2. Fire Protection System (FPS): The FPS has seen the complete installation of exit lights, fire hose cabinets, fire alarm pipes, and fire suppression pipes. Sprinkler heads are now being installed, fully complying with current safety standards.
1.3. Electrical Infrastructure: The Kiosk substation is being fast-tracked for connection and power supply, preparing for operational readiness.
2. Auxiliary Areas: Synchronized and Modern

Parallel to the factory progress, auxiliary facilities such as the pump house, restrooms, waste disposal area, and operations building are also being developed simultaneously. All are constructed to strict technical standards, ensuring synchronized, efficient, and cost-effective operations for tenant businesses. Infrastructure is also nearing completion, including the wastewater and restroom drainage systems, and internal roads for the factory lines.

The construction progress at HLI EcoHub Nam Ha not only demonstrates the developer’s capability in fulfilling project commitments but also clearly showcases its ready-built factory solution, built to LEED standards. This approach focuses on green industrial development, energy efficiency, and attracting FDI enterprises.
With its strategic location adjacent to Dong Nai – just 1.5 hours from Ho Chi Minh City – coupled with comprehensive infrastructure and solid progress, HLI EcoHub Nam Ha is an ideal choice for businesses seeking high-quality ready-built factories in Lam Dong.



HLI ECOHUB NAM HA READY-BUILT FACTORY
– Location: Nam Ha Hamlet, Tra Tan Commune, Lam Dong Province
– Hotline: 0964 582 346
– Email: contact@hoalonginvest.com
– Office: 19 Tran Quy Kien Street, Binh Trung Ward, HCM City












