Wrasse climbing gourami amur pike Arctic char, steelhead sprat sea lamprey grunion. Walleye

Contacts
Location
523 Sylvan Ave, 5th Floor
Mountain View, CA 94041USA

Introduction

HLI ECOHUB NAM HAPROJECT INFORMATION

With thoughtfully planned infrastructure, fully integrated utilities, and a strategic location adjacent to major industrial zones, HLI EcoHub Nam Ha emerges as a premier investment destination for forward-thinking enterprises. Beyond offering a competitive edge in operational efficiency, the project serves as a sustainable platform that aligns with the vision of green industrialization delivering long term value, cost optimization, and future ready grow.

HLI ECOHUB NAM HAMAIN INFORMATION

  • Hoa Long Investment Construction Joint Stock Company (Hoa Long Invest)
  • Nam Ha Hamlet, Tra Tan Commune, Lam Dong Province
  • 27.2 hectares
  • Q3/2025
  • Ready-built factory
  • Built-to-suit factory
  • Factory built & transferred
thong tin du an ecohub nam ha Eng

HLI ECOHUB NAM HAREGIONAL CONNECTIVITY

Located in Lam Dong, HLI ECOHUB NAM HA boasts a strategic position, providing convenient connectivity to major economic centers in the southern region. With a comprehensive transportation system, including highways, national roads, seaports, and airports, the transportation of goods and raw materials becomes swift and efficient, enabling businesses to optimize logistics costs and enhance competitive capacity.

Located in Lam Dong, HLI ECOHUB NAM HA boasts a strategic position, providing convenient connectivity to major economic centers in the southern region. With a comprehensive transportation system, including highways, national roads, seaports, and airports, the transportation of goods and raw materials becomes swift and efficient, enabling businesses to optimize logistics costs and enhance competitive capacity.

ban do vi tri chien luoc hli ecohub nam ha eng

HLI ECOHUB NAM HADETAILED INFORMATION

TECHNICAL INFRASTRUCTURE

TECHNICAL INFRASTRUCTURE

Minimum Factory Area:
1,400 m²

Factory Dimensions:
(Length x Width x Height)

  • Large factory: 106 x 69 x 13 (m)
  • Small factory: 106 x 53 x 13 (m)

Clearance Height:
7.5 ~ 10 m

Column spacing:
8.5 m

Main entrance:  4 x 4 m
Rolling door: 4 x 4 m

Floor loading capacity:
2 tons/m²

Floor material:
Hardener

Electrical station:
100kVA/1,000

Minimum office area:
100

INDUSTRIAL INFRASTRUCTURE

HLI EcoHub Nam Ha is fully equipped with technical infrastructure to help businesses quickly stabilize production and operations.

Category

  • Detail

Internal traffic:

  • Internal road width of 12m

Parking lot:

  • Reasonably designed with wide access lanes for convenience

Power supply:

  • Medium voltage 110/22kV, supplied from Lam Dong & Dong Nai, ensuring continuous stability

Water supply:

  • Flexible capacity ranging from 6,000 to 14,000 m³/day

Wastewater treatment:

  • Treatment plant capacity of 950 m³/day and night

Security:

  • Comprehensive security system ensuring safety

Fire prevention and fighting (FPF):

  • Sprinkler heads every 3m
  • Automatic fire alarm
  • Roof smoke extraction fans
  • Lightning protection system

DIVERSIFIED INDUSTRY RESPONSES

HLI ECOHUB NAM HAPROJECT INTRODUCTION VIDEO

预约参观厂房

请填写以下完整信息。我们将尽快与您联系。

FACTORY TOUR REGISTRATION

Please leave your information, and we will contact you for a consultation as soon as possible.