The HLI EcoHub Nam Ha construction site is entering an accelerated completion phase, with many key components being implemented simultaneously to ensure on-schedule handover.
FACTORY AREA – FINAL ITEMS BEING URGENTLY COMPLETED:
- Restroom tiling is being fast-tracked to ensure integrated interior finishing.
- Floor grinding is being completed to ensure flatness, load-bearing capacity, and aesthetics.
- Emergency exit doors are being installed, ensuring safety and fire prevention standards are met.
- Roof vent installation and canopy frame alignment are being carried out in parallel with the overall progress.
AUXILIARY AREAS – SYNCHRONIZED SUPPORT INFRASTRUCTURE DEPLOYMENT:
- Underground Firefighting Water Tank: Internal waterproofing plastering has been completed, ensuring water storage capacity and fire safety.
- Pump House, Waste House, Operations House: Roof waterproofing construction continues, enhancing the durability of auxiliary structures.
- Kiosk Substation: Beam and perimeter formwork has been removed, preparing for the next finishing phase.
Video HLI EcoHub Nam Ha Factory Project Progress Update:
HLI ECOHUB NAM HA READY-BUILT FACTORY
– Location: Nam Ha Hamlet, Tra Tan Commune, Lam Dong Province